Geographic Information Systems Project Manager                                                                              Bozeman, Montana - USA

Yellowstone Ecosystem Studies

November 01, 2000 – July 10, 2001
April 20, 2002 – May 20, 2002

                                                                      

DUTIES

  • Using ESRI ArcInfo 7.0, and ArcView 3.2, I processed wolf, and coyote behavior data in coverage, shapefile, and e00 format on both UNIX and Windows operating systems   
  • Provide spatial analysis with the Animal Movement extension in ArcView 3.2 to determine home range, and movement statistics for wolf and coyote behaviour.
  • Conduct viewshed analysis using 10 meter DEM and gps data from field observation sites to determine confidence ratings for telemetry and sighting data.

PROJECTS

  • Yellowstone Ecology pre and post wolf reintroduction – Working independently, I managed a federally and privately funded GIS project, which looked at the ecological processes occurring in Yellowstone National Park as a result of grey wolf reintroduction.  Project emphasis looked at coyote behaviour post wolf reintroduction.  I was responsible for digitizing and attributing all field data associated with wolf and coyote dens, sightings, and behaviour.  I managed the creation and enhancement of this data for the duration of the project, while reporting weekly with maps and data to the project director.